Afşin – Elbistan B Termik Santrali Gama – Tekfen – Tokar adi ortaklığı, Enka İnşaat ve Mitsubishi Corporation (Japonya) konsorsiyumu ile yapılan, 4 x 360 MW linyit yakıtlı konvansiyonel elektrik santrali projesinde, 5.913 ton çelik yapı imalatı, 2.330 ton ekipman montajı ve 1.400 ton boru imalat ve montajı GTT’nin alt yüklenicisi olarak Kartal Endüstri tarafından yapılmışttır.
Afşin – Elbistan B Thermal Power Plant In the 4 x 360 MW lignite-fired conventional power plant project, carried out by Gama – Tekfen – Tokar ordinary partnership, Enka İnşaat and Mitsubishi Corporation (Japan) consortium, 5,913 tons of steel structure manufacturing, 2,330 tons of equipment assembly and 1,400 tons of pipe manufacturing and installation were carried out by GTT. It was built by Kartal Endüstri as a subcontractor of .
Афшин – Эльбистанская тепловая электростанция B В рамках проекта традиционной электростанции, работающей на буром угле, мощностью 4 x 360 МВт, реализуемого простым товариществом Гама – Текфен – Токар, консорциумом Enka İnşaat и Mitsubishi Corporation (Япония), 5 913 тонн изготовления стальных конструкций, 2 330 тонн сборки оборудования и 1 400 тонн изготовление и монтаж труб выполнила компания «ГТТ». Он был построен компанией Картал Эндустри в качестве субподрядчика.